PAEC Calonge Industrial Land
Facilities and community services
- Drinking water network
- Electricity supply
- Natural gas supply
- Telephone and fibre-optic telecommunications network
- Separated sewer system
- Extensive road network
Urban planning parameters
- Single building
- Net buildability: 0,827 built sqm/land sqm
- Max land use: 50%
- Main use: industrial
- Min lot: subzone 7a (4.000 m2), subzone 7b (2.500 m2)
- Min facade and backfront to the street: subzone 7a (50m), subzone 7b (40m)
- Max number of activities per lot: subzone 7a (3), subzone 7b (5)
- Street, lateral and back separations: 5m
- Max height: 12,5 m